Three plants, three findings

October 24, 20263 min readPoC/Demo

The test rigs stay the instruments in the browser. These three plants show the same check on a different machine: a separation distance, a stop, a locked route. Each section names the norm that forces the finding.

Vi Heavy · Quarry

A worker crosses the loading point. The warning zone throttles the machine, the protection zone stops it. The distance follows ISO 13855:2024, the two steps ISO 13849, the autonomous earth-moving machine ISO 17757.

PoC/Demo · SSM · ISO 13855:2024 · ISO 13849 · ISO 17757 · NDA area →

Vi Heavy · Lime plant

The pit on the aerial image: loader and truck, the sensor zone on the loading point. Terrain and site layout. The run shows the plant, not a stop.

PoC/Demo · aerial image · loading point · NDA area →

ViPort · Harbour

Crane, ship and container yard on the terminal terrain. The clip shows this plant. The live scene runs the mock stop. EN 15011 applies to the crane, ISO 13849-1 and ISO 13855 to distance and stop. Not an accepted crane stop.

PoC/Demo · Mock · EN 15011 · ISO 13849-1 · ISO 13855 · Open the plant →

ViStuttgart21 · Main station

The scene is a reconstruction. It is not the planning of DB InfraGO. The hall cups stand on the platform axes. The route locks the point positions it needs. The train runs only that topology.

Reconstruction · not for construction · the route locks the point positions it needs

The runs do not replace engineering judgement, a safety release, or certification.