Interactive

Experience the Graph in Action

Three interactive demo scenarios show how requirements, simulations, and test artifacts are connected in the deterministic graph.

NEW — Live Traceability Check
REQ-0427: Vision Failure Detection <50ms → BLOCKED
2 rule violations found • 4/5 edges verified • 80% Score

Multi-Sensor Fusion — SIL Test Topology

SIL 3 ✓
LiDAR
60%
Vision
40%
Fusion
48ms
Fusion Latency (Primary)
48ms
Fusion Latency (Fallback)
52ms
Safety Mechanisms
42 SIL 3
Redundancy Model
1oo2D

Zone Entry — SIL Live Demo

30s Run
Open SIL Test Report
🦾 3D Safety Demo
ABB IRB 6700 — ISO 10218-2 Safety Zones
6-Axis Robot Arm • Live Safety Status • Interactive Joint Control
Request Your Own Demo